« Return to Community Goals listing

Torval Mining Ltd Requests Resources

Location: Pride of Bitterwood, EGM 559

Ends: 2021-10-28 05:00:00 +0000

Activity: Trading

Objective: Microbial Furnaces, Mineral Extractors, Geological Equipment

Progress: 31,611,235 / 44,800,000 (70.56%)

Last updated: 2021-10-28 06:00:02 +0000

First seen: 2021-10-21 12:00:00 +0000

Bulletin

Senator Zemina Torval's new corporation requires deliveries of commodities to its megaship in the EGM 559 system.

Constantia Torval, the senator's daughter and operations director of the company, provided details of the initiative:

"Now that we are a fully independent business, additional resources are urgently needed to continue providing services to the Empire. My goal is to ensure that the Torval name remains synonymous with efficiency and dedication."

"Shipments of Geological Equipment, Microbial Furnaces and Mineral Extractors can be delivered to the megaship Pride of Bitterwood in the EGM 559 system. From there, they will be transferred to our headquarters at Torval Orbital in LTT 198."

Should Tier 1 of this delivery initiative be reached, the top 25% of contributors will receive a fully engineered class 1 rating D mining laser with long range. The module will be placed in storage at the Pride of Bitterwood in the EGM 559 system by Friday the 29th of October 3307.

Should Tier 2 be reached, the top 50% will receive the module.

Should Tier 3 be reached, the top 75% will receive the module.

For each tier reached, all Torval Mining Ltd megaships will provide a 10% reduction on all available mining modules up to a maximum of 50%. This discount will start on Friday the 29th of October 3307 and last for the next four weeks.

Should Tier 3 be reached, Torval Mining Ltd will deploy technology brokers to its megaships who will uniquely stock the engineered mining laser.

The campaign begins on the 21st of October 3307 and will run for one week. If the final target is met earlier than planned, the campaign will end immediately.